
BCS: Epci Enclosure Special Inspections
REI Engineers conducted on-site construction observation + documentation of exterior masonry walls, curtain wall systems, storefront systems, and metal panels to verify work complied with applicable project documents (plans + specifications, material manufacturer’s requirements, materials list, etc.). Daily reports were prepared + submitted.
REI conducted performance testing per AAMA 501.2, Quality Assurance + diagnostic water leakage field check of installed storefronts, curtain walls, and sloped glazing systems.
SEE SIMILAR PROJECTS
FMG: Factory Hurricane Maria Damage Assessment
Humacao, Puerto Rico
Hotel Bennett Charleston: Below-Grade Waterproofing
Charleston, SC