BCS: Epci Enclosure Special Inspections

REI Engineers conducted on-site construction observation + documentation of exterior masonry walls, curtain wall systems, storefront systems, and metal panels to verify work complied with applicable project documents (plans + specifications, material manufacturer’s requirements, materials list, etc.). Daily reports were prepared + submitted.

REI conducted performance testing per AAMA 501.2, Quality Assurance + diagnostic water leakage field check of installed storefronts, curtain walls, and sloped glazing systems.

 

 